News

15 Schools To Benefit From Renewable Energy Project To Reduce Electricity Bills



IPOH, Aug 12 (Bernama) -- A total of RM3 million has been allocated for the installation of solar photovoltaic (PV) panels in 15 government-aided schools (SBK) in the Kinta district under the Renewable Energy pilot project implemented by Tenaga Nasional Berhad (TNB) and its subsidiary GSPARX Sdn Bhd (GSPARX). 

Ipoh Timur Member of Parliament Howard Lee Chuan How said that 12 SBK have signed a Memorandum of Cooperation (MoC) to install the PV panels to date.

“This MoC is aimed at obtaining approval from the schools to allow GSPARX to assess whether the installation can be carried out. 

“If there are no issues, the installation will be implemented as soon as possible, and all expenses related to the matter will be fully covered by GSPARX, which is a subsidiary of TNB,” he said at a press conference at Sekolah Jenis Kebangsaan Cina (SJKC) Sam Chai here today.

Earlier, Lee witnessed the signing of the MoC between GSPARX managing director Elmie Fairul Mashuri and representatives of the 12 SBK involved. 

The SBK are Sekolah Menengah Kebangsaan (SMK) Perempuan Methodist, Sekolah Menengah Jenis Kebangsaan Cina (SMJKC) Ave Maria Convent, SMJKC Sam Tet, SMJKC Poi Lam and SMJKC Yuk Choy, SJKC Ave Maria Convent, SJKC Sam Tet, SJKC Poi Lam, SJKC Yuk Choi, SJKC Sam Chai, SJKC Chung San and Sekolah Kebangsaan Perempuan Methodist.

Lee said the project will allow the schools to save up to 20 per cent of electricity bills annually.

“We expect the 12 SBK can save up to RM200,000 annually, with a target for collective solar energy generation of 1 megawatt,” he said, adding that the installation of PV panels supports the government’s commitment to reducing greenhouse gas emissions and ensuring environmental sustainability.

On the installation details, he said each school needs to sign a 20-year agreement with GSPARX to benefit from the project.

“If the schools have the necessary funds, they can purchase the facility from GSPARX even while still under contract. However, the schools will need to pay the maintenance and monitoring costs to GSPARX,” he added.

-- BERNAMA

 

 


 





    Other News

Sarawak Lepasi Sasaran Kapasiti Gabungan Tenaga Boleh Baharu Tahun Ini - Abang Johari

Oleh Nur Ashikin Abdul Aziz

SINGAPURA, 21 Okt (Bernama) -- Sarawak mencapai 62 peratus sasaran campuran kapasiti tenaga boleh baharu (TBB) tahun ini, melepasi sasaran 60 peratus yang digariskan dalam Strategi Pembangunan Pasca COVID-19 (PCDS) 2030.


Sarawak Pacu Pertumbuhan Tenaga Boleh Diperbaharui Untuk Manfaat ASEAN - Premier

SINGAPURA, 21 Okt (Bernama) -- Sarawak komited menyokong peralihan tenaga boleh diperbaharui di Asia Tenggara dengan memanfaatkan potensinya sebagai "Bateri ASEAN," yang akan membekalkan tenaga bersih menerusi sambungan Grid Kuasa Borneo dan ASEAN.             


Belanjawan 2025 Percepat Peralihan Kepada Tenaga Bersih - Solarvest

KUALA LUMPUR, 19 Okt (Bernama) -- Belanjawan 2025 merupakan satu langkah ke arah mempercepat peralihan kepada tenaga bersih di Malaysia, kata Solarvest Holdings Bhd. 



© 2024 BERNAMA. All Rights Reserved. Disclaimer | Privacy Policy | Security Policy This material may not be published, broadcast,
rewritten or redistributed in any form except with the prior written permission of BERNAMA.

Contact us :
General [ +603-2693 9933, helpdesk@bernama.com ]
Product/Service Enquiries [ +603-2050 4466, digitalsales@bernama.com ]