News

Proton unveils solar power facility at Tanjung Malim



KUALA LUMPUR, March 24 (Bernama) -- Proton has unveiled its solar power initiative at its Tanjung Malim plant to help the national car maker reduce its carbon dioxide (CO2) emissions by 11,536 tonnes a year while generating utility cost savings. 

Proton's solar power facility has a footprint of 23.4 acres and involves a car park housing 2,880 cars, which is also used as a transit point for cars produced at Tanjung Malim before being distributed nationwide, a statement from the national car maker said.

This parking lot bi-facial solar panel facility, the biggest in Malaysia, is covered by 20,544 bi-facial solar panels, named as such because they can generate energy from direct sunlight on top as well as those reflected from the ground, and from cars parked underneath the panels.

The cars are also protected from the elements because they are shaded. The combined power generated is 12 megawatt peak (MWp), enough to meet up to 25 per cent of the plant's power consumption.

Built and commissioned by Pekat Group and its associate MFP Solar, the solar panel facility is able to generate 9MWp. 

“It allows Proton to potentially save up to RM4.39 million a year on its energy bill with a further saving of RM1.46 million available via the 3MWp generated by the factory roof-mounted panels,” the statement said.

The company launched its first Proton Green Wheel and Green Policy back in 2015, comprising five phases involving energy management system; energy efficiency; waste and water management; renewable energy via solar energy plant; and digitise all of Proton's energy data on a cloud server to introduce artificial intelligence and big data analysis. 

Over a five-year period from 2015-2020, these initiatives saw RM20 million in savings in energy bill, equivalent to 55,000 MWh savings and a reduction of over 40,000 tonnes of CO2 emissions.

-- BERNAMA




    Other News

Sarawak Lepasi Sasaran Kapasiti Gabungan Tenaga Boleh Baharu Tahun Ini - Abang Johari

Oleh Nur Ashikin Abdul Aziz

SINGAPURA, 21 Okt (Bernama) -- Sarawak mencapai 62 peratus sasaran campuran kapasiti tenaga boleh baharu (TBB) tahun ini, melepasi sasaran 60 peratus yang digariskan dalam Strategi Pembangunan Pasca COVID-19 (PCDS) 2030.


Sarawak Pacu Pertumbuhan Tenaga Boleh Diperbaharui Untuk Manfaat ASEAN - Premier

SINGAPURA, 21 Okt (Bernama) -- Sarawak komited menyokong peralihan tenaga boleh diperbaharui di Asia Tenggara dengan memanfaatkan potensinya sebagai "Bateri ASEAN," yang akan membekalkan tenaga bersih menerusi sambungan Grid Kuasa Borneo dan ASEAN.             


Belanjawan 2025 Percepat Peralihan Kepada Tenaga Bersih - Solarvest

KUALA LUMPUR, 19 Okt (Bernama) -- Belanjawan 2025 merupakan satu langkah ke arah mempercepat peralihan kepada tenaga bersih di Malaysia, kata Solarvest Holdings Bhd. 



© 2024 BERNAMA. All Rights Reserved. Disclaimer | Privacy Policy | Security Policy This material may not be published, broadcast,
rewritten or redistributed in any form except with the prior written permission of BERNAMA.

Contact us :
General [ +603-2693 9933, helpdesk@bernama.com ]
Product/Service Enquiries [ +603-2050 4466, digitalsales@bernama.com ]