News

Tenaga shortlisted for bid to develop solar plant in Bukit Selambau



KUALA LUMPUR, March 15  -- Tenaga Nasional Bhd’s wholly owned subsidiary, TNB Renewables Sdn Bhd (TRe) has received a Letter of Notification (LoN) as a shortlisted bidder from the Energy Commission (EC).

In a filing with Bursa Malaysia on Monday, the group said the LoN dated March 12 is for TRe to develop a 50 megawatts of AC power (MWac) (75 MWdc) large scale solar photovoltaic plant in Bukit Selambau, Kedah subsequent to a competitive bid process conducted by the EC.

It added that the LoN requires TRe to fulfil certain requirements, which will be issued by the EC in due time.

-- BERNAMA

 

 





    Other News

Sarawak Lepasi Sasaran Kapasiti Gabungan Tenaga Boleh Baharu Tahun Ini - Abang Johari

Oleh Nur Ashikin Abdul Aziz

SINGAPURA, 21 Okt (Bernama) -- Sarawak mencapai 62 peratus sasaran campuran kapasiti tenaga boleh baharu (TBB) tahun ini, melepasi sasaran 60 peratus yang digariskan dalam Strategi Pembangunan Pasca COVID-19 (PCDS) 2030.


Sarawak Pacu Pertumbuhan Tenaga Boleh Diperbaharui Untuk Manfaat ASEAN - Premier

SINGAPURA, 21 Okt (Bernama) -- Sarawak komited menyokong peralihan tenaga boleh diperbaharui di Asia Tenggara dengan memanfaatkan potensinya sebagai "Bateri ASEAN," yang akan membekalkan tenaga bersih menerusi sambungan Grid Kuasa Borneo dan ASEAN.             


Belanjawan 2025 Percepat Peralihan Kepada Tenaga Bersih - Solarvest

KUALA LUMPUR, 19 Okt (Bernama) -- Belanjawan 2025 merupakan satu langkah ke arah mempercepat peralihan kepada tenaga bersih di Malaysia, kata Solarvest Holdings Bhd. 



© 2024 BERNAMA. All Rights Reserved. Disclaimer | Privacy Policy | Security Policy This material may not be published, broadcast,
rewritten or redistributed in any form except with the prior written permission of BERNAMA.

Contact us :
General [ +603-2693 9933, helpdesk@bernama.com ]
Product/Service Enquiries [ +603-2050 4466, digitalsales@bernama.com ]