News

Lynas waste: more info needed on W.Australia's refusal - Dr Wan Azizah



KUALA LUMPUR, May 7 (Bernama) -- The government requires more information on Western Australia’s reported refusal to accept radioactive waste from Lynas' rare earth processing plant in Gebeng, Kuantan, says Deputy Prime Minister Datuk Seri Dr Wan Azizah Wan Ismail.

“We need to discuss with the Ministry of Energy, Science, Technology, Environment and Climate Change (MESTECC),” she told reporters at the parliament building here today.

Yesterday a local news portal reported Western Australia’s Minister of Mining, Petroleum, Energy and Industry Relations, Bill Johnston as saying that Australia would not accept such waste back from overseas although he acknowledged that the best means of disposal was to its place of origin.

Last month, MESTECC deputy minister Isnaraissah Munirah Majilis disclosed that minister Yeo Bee Yin had on Feb 26 sent a letter to Australia for cooperation in ensuring that the waste from Lynas was returned to Western Australia.

The ministry wants the country to help find a way to facilitate disposing of the Water Leach Purification (WLP) residue, which was supposed to be sent to Australia before September as part of the company's licensing requirements.

Besides WLP, the Lynas plant also produces non-radioactive neutralisation underflow (NUF). As of December 2018, WLP waste accumulated at the Lynas facility is 451,564 metric tons while NUF waste, 1.113 million metric tons.

Meanwhile, Dr Wan Azizah said when asked about oversupply of food distributed to the homeless around the capital which inevitably go to waste, she called on the non-governmental organisations involved not to focus on one place to do charity. 

"We do not want to encourage wastage during the fasting month or non fasting months; it’s one of the issues we have to manage. That's why we have a food bank and do not want to waste.

“If possible, distribute to other places where it is needed. Don’t concentrate only in one place. Look for those in need..like in mosques and places where such food is not available,” she said.

-- BERNAMA

 

 





    Other News

Sarawak Lepasi Sasaran Kapasiti Gabungan Tenaga Boleh Baharu Tahun Ini - Abang Johari

Oleh Nur Ashikin Abdul Aziz

SINGAPURA, 21 Okt (Bernama) -- Sarawak mencapai 62 peratus sasaran campuran kapasiti tenaga boleh baharu (TBB) tahun ini, melepasi sasaran 60 peratus yang digariskan dalam Strategi Pembangunan Pasca COVID-19 (PCDS) 2030.


Sarawak Pacu Pertumbuhan Tenaga Boleh Diperbaharui Untuk Manfaat ASEAN - Premier

SINGAPURA, 21 Okt (Bernama) -- Sarawak komited menyokong peralihan tenaga boleh diperbaharui di Asia Tenggara dengan memanfaatkan potensinya sebagai "Bateri ASEAN," yang akan membekalkan tenaga bersih menerusi sambungan Grid Kuasa Borneo dan ASEAN.             


Belanjawan 2025 Percepat Peralihan Kepada Tenaga Bersih - Solarvest

KUALA LUMPUR, 19 Okt (Bernama) -- Belanjawan 2025 merupakan satu langkah ke arah mempercepat peralihan kepada tenaga bersih di Malaysia, kata Solarvest Holdings Bhd. 



© 2024 BERNAMA. All Rights Reserved. Disclaimer | Privacy Policy | Security Policy This material may not be published, broadcast,
rewritten or redistributed in any form except with the prior written permission of BERNAMA.

Contact us :
General [ +603-2693 9933, helpdesk@bernama.com ]
Product/Service Enquiries [ +603-2050 4466, digitalsales@bernama.com ]