News

Underwater tunnels completed for China-Russia gas pipeline

HARBIN, March 29 (Bernama) -- Construction of two underwater tunnels for the China-Russia east-route natural gas pipeline has been completed and passed acceptance checks, Xinhua news agency reported constructors as saying.

The two tunnels, each 1,139 meters long, connect Heihe in northeast China's Heilongjiang Province and Blagoveshchensk in Russia.

This underwater shield crossing project passes through the Heilongjiang River along the Sino-Russian border. The workers had to overcome challenges such as extremely cold weather and complicated landforms to complete the project.

The project was completed as scheduled with high quality, the inspector SGS S.A. said, after going through the entire process together with China Petroleum Pipeline Engineering Co., Ltd., the Chinese constructor.

The 3,371-km-long Chinese section of China-Russia east-route natural gas pipeline starts in Heihe and terminates in Shanghai. Construction began in June 2015 and will be completed in 2020.

The Russian part of the pipeline, which started construction on Sept. 1, 2014, will link the Kovyktin and Chayandin gas fields in Siberia with the eastern port city of Vladivostok, covering a total distance of nearly 4,000 km.

Upon completion, the pipeline is expected to provide China with 38 billion cubic meters of natural gas from Russia annually.

-- BERNAMA




    Other News

Sarawak Lepasi Sasaran Kapasiti Gabungan Tenaga Boleh Baharu Tahun Ini - Abang Johari

Oleh Nur Ashikin Abdul Aziz

SINGAPURA, 21 Okt (Bernama) -- Sarawak mencapai 62 peratus sasaran campuran kapasiti tenaga boleh baharu (TBB) tahun ini, melepasi sasaran 60 peratus yang digariskan dalam Strategi Pembangunan Pasca COVID-19 (PCDS) 2030.


Sarawak Pacu Pertumbuhan Tenaga Boleh Diperbaharui Untuk Manfaat ASEAN - Premier

SINGAPURA, 21 Okt (Bernama) -- Sarawak komited menyokong peralihan tenaga boleh diperbaharui di Asia Tenggara dengan memanfaatkan potensinya sebagai "Bateri ASEAN," yang akan membekalkan tenaga bersih menerusi sambungan Grid Kuasa Borneo dan ASEAN.             


Belanjawan 2025 Percepat Peralihan Kepada Tenaga Bersih - Solarvest

KUALA LUMPUR, 19 Okt (Bernama) -- Belanjawan 2025 merupakan satu langkah ke arah mempercepat peralihan kepada tenaga bersih di Malaysia, kata Solarvest Holdings Bhd. 



© 2024 BERNAMA. All Rights Reserved. Disclaimer | Privacy Policy | Security Policy This material may not be published, broadcast,
rewritten or redistributed in any form except with the prior written permission of BERNAMA.

Contact us :
General [ +603-2693 9933, helpdesk@bernama.com ]
Product/Service Enquiries [ +603-2050 4466, digitalsales@bernama.com ]